Long Point Causeway Improvement Project

News

Ecopassage construction photos added

We’ve added a new photo gallery in the “Maps and photos” section under the More Info heading. The photos show the installation of the two types of smaller terrestrial ecopassages for wildlife and the much larger aquatic ecopassage that will reconnect a waterway in the Big Creek Marsh with Long Point Bay while providing safe passage for wildlife under the Causeway. It’s interesting to note that each section of the aquatic culvert weighs 20 metric tons (about 44,000 pounds).